Project Management Checklist for Retrofit: Pre- design approval
Introduction
Retrofit programmes delivered under the Warm Homes funding streams can be complex. Typically, these programmes are delivering works at scale, across multiple property types and experience regular changes. Each retrofit project will need to demonstrate it has followed the PAS 2035 standard and the programme overall will need to adhere to the requirements outlined by the Department of Energy and Net Zero (the funding body).
Published: June 2025
Contents
Welcome to the Toolkit: Project Management Checklist for Retrofit, Pre- design approval
Navigating all the work streams which go into a successful retrofit programme can be overwhelming. This toolkit sets out a step-by-step checklist of tasks which are designed to ensure you are well-prepared to deliver your retrofit programme to a high standard.
Download the PDF below to access this Toolkit.
Readers that would like this document in a more accessible format should contact rise@turntown.co.uk.