Introduction

If your project involves changes in required connection capacity or the ability to export surplus electricity, then the District Network Operator (DNO) needs to be informed.

Published: October 2025

Contents

    Welcome to the Supply Chain Advice Pack: Distribution Network Operator (DNO) connections for housing 

    The DNO is responsible for managing electricity connections in your geographical region. This could include any of the following technologies: Solar photovoltaic (PV), Heat pumps, Electric vehicle (EV) charge points and Battery storage (BESS). When you are installing these technologies, they are referred to in this guidance document as an ‘installation’. An installation can be made up of more than one technology, i.e. installing Solar PV with a battery system. 

    Download the PDF below to access this Advice Pack. 

    Readers that would like this document in a more accessible format should contact rise@turntown.co.uk.

    To be kept up to date with future Advice Packs, resources developed for businesses working in retrofit, and upcoming training and events, please join the RISE supply chain mailing list. You'll hear from us monthly, with relevant updates and information.

    Join the mailing list here.

     

     

     

    Back to top